When you need one
The District of West Vancouver requires a stormwater management plan (SWMP) for any new single-family home or duplex, and for the redevelopment of one. The plan is submitted to the District’s Land Development Department with your building permit.
What the plan covers
The District’s guidelines call for a post-development site plan showing the proposed land use, the permeable and impermeable surfaces, and the proposed stormwater management facilities.
- Site plan of permeable and impermeable surfaces
- Proposed stormwater management facilities
- Design to the District’s single-family stormwater guidelines
- Coordination with the structural, envelope and erosion control design
Stormwater management plans are part of 28 of our 34 listed projects.
